| Field | Detail |
|---|
| Primary artifact(s) | controls/water/st/fill-state-machine.st |
| Spec | RO-SPEC-001 §5.6 ; WIRE-001 — |
Summary
Level thresholds + dosing enables.
Test
controls/water/sim-tests/sim-fill-happy-path.md
Open items
- Merge with dosing timer strategy